Importance of Masonry Estimator & Field Crew Communication & Coordination

Words: Jameel Ervin

Words: Jameel Ervin, President at W.B.F. Construction Inc.
Photo: kali9

In masonry construction there are distinct departments: Estimating, Project Management/Field Crew, Accounting, Executives, etc. While each have their own distinct responsibilities, none of them can stand on their own. The relationships among the departments are interdependent which is why effective communication is critical.

Estimating Dept./Estimator’s Responsibilities

An estimator estimates projects as accurately and precisely as possible. 

Those estimates have all required material quantity, material cost, install costs for all these materials, crew size, total crew days, cost of equipment required, and all other misc. costs that will be required to finish the masonry scope of work for projects.

Productivity rates are compiled by estimator, based on records of completed jobs.

Masonry estimation includes brickwork, CMU blocks, stone masonry quantity, etc. It is a complicated and time-consuming process that involves a thorough understanding of building walls, reinforcement, labor costs, material costs, transportation, and much more. Even the slightest misstep during the preparation of your masonry estimate can cause you to lose a potential job or run over budget.

The masonry construction industry is highly competitive, and profit margins are slim. You can’t afford to overquote or underquote on mega masonry projects. If you overquote on the project, you risk losing the contract, and if you underquote on your masonry takeoffs, you could be out of pocket when it comes time to pay for the unaccounted work.

The Estimating Department/Team or Estimator’s job and ultimate goal is to bid and win profitable projects for the company. It’s important that each awarded job is profitable.

Project Management Team/Foreman/Superintendent/Field Crew

Efficient & Effective Field Crew must have:

  • An ample number of qualified craftsmen
  • Qualified and sufficient supervision
  • The right equipment for the job

The Field Crew’s responsibility is to do work efficiently and effectively to protect the company’s profit, ensure that projects are completed within timely and budgetary constraints, and achieve much better productivity than estimated, using the most efficient methods, equipment, and crew. Always keep the total cost below the anticipated total cost for the project. Keep tracking expenses/cost regularly in order to control cost.

Conclusion

The best masonry projects are built by the best teams as a whole, not by one or two participants.

Concerted effort is necessary to facilitate effective communication, which begins with the retention of each and every member of the team. A successful masonry project demands that all professionals involved are experienced, appropriate and are team players with complementary skill sets. Once on board, they need to be coordinated and managed to bring out their best work to meet the vision and goals of the project.

Mistakes are unavoidable in construction, but they can be mitigated with proper communication and the effective use of construction management processes. Relying on a professional project manager/superintendent/foreman to provide careful, proactive attention to detail, many problems can be anticipated early and mitigated. When the project finally commences construction, the contractors are much more likely to be able to accomplish the project smoothly, on time and within budget.

With the right resources, tools, knowledge, team, and attitude, the future of your masonry business has no limits.

What gives with head protection? Why workers want to keep their hard hats and ditch safety helmets.
April 2025

Last August, I took my pickup to the dealership for a nagging check engine light. While it was being looked over, I chatted with the salesman I normally deal with, and he told me about the latest and greatest 2025 models. He told me how the twin turbo inl

Government Affairs: Bringing North Carolina to Washington, D.C. and Hopefully Young People to Your Jobsites
April 2025

For you long time members of the Mason Contractors Association of America you likely remember our Annual Washington, D.C. Fly-In where MCAA members from around the country would come to Washington, D.C. meeting with Members of Congress from their home sta

Chairman's Message: While We Are Still Here
April 2025

I truly value my days working on construction sites during the summers of my high school and college days. Some moments in our youth are so clearly meaningful that we file them away in our subconscious to be recalled when life events require inspiration.

Contractor Tip of the Month: The Tough Calls That Define a Leader
April 2025

In construction, every project balances a delicate trio: coordination, precision, and timing. However, beyond blueprints and schedules, leadership demands something far greater—the ability to lead and make difficult decisions that shape the future of a co