Douglas Plaza Apartments
Douglas Plaza Apartments (left; see cover), Elm Grove, Wis. Architect: Paul F. Schmitter Architects, Inc. Mason Contractor: TRICO Masonry, Inc. (Center) National Savings & Loan Association, Wauwatosa, Wis. Architect: Py-Vavra Architects-Engineers, Inc. Mason Contractor: Clarence Bundy. (Right) Holy Hill Addition, Shrine of Mary, Help of Christians, Hubertus, Wis. Architect: Brust-Heike Design Associates. Mason Contractor: D. M. and C. M. Frey, Inc.
WISCONSIN AWARDS
continued from page 8
The theme for the basic envelope design.
"The masonry veneer is a combination of rock and seam-face lannonstone mixed with a few cobbles from the site. This material closely resembles the limestone that was quarried in the area in the 1840s."
The board which selected the project winners was composed of Ray Prossen, R. J. Prossen. Inc.: Allan E. Knuth, Knuth Masonry, Inc.: Eldred Heidschmidt, D. G. Beyer, Inc.: Jerry Dufour, Ma-Con Construction Corp., and Fred Treu, TRICO Masonry, Inc.
Serving as advisors were Jack Myers, Bend Industries; Claude Gagnon, Wisconsin Face Brick Co., and Les Strand. Herb Onasch and Tony Monday of Bricklayers Local Union #8.
DO YOU HAVE A MASONRY CLEANING PROBLEM THAT IS COSTING YOU MONEY?
Why not use our Kem-O-Kleen chemical induction machine, and reduce your cost per square foot of cleaning masonry.
The Model K-2150 is rated at 2,150 PSI at 3 gallons per minute.
This machine is powerful enough to clean a building 20 stories high while setting on the ground, yet it is portable enough to perform on a small cleaning job.
For further information write:
Kem-O-Kleen, Inc.
77 East Floyd Avenue
Englewood, CO 80110
(303) 761-6683