Masonry Magazine October 1982 Page. 37

Words: Howard Jenkins, Don Zimmerman, Robert Hunter
Masonry Magazine October 1982 Page. 37

Masonry Magazine October 1982 Page. 37
disputes between the Laborers and the Operating Engineers over

disputes between the Laborers and the Operating Engineers over the operation of forklifts in connection with masonry work at various construction sites throughout the State of Wisconsin. The work was awarded to the Operating Engineers in all of the decisions, and it is therefore the contention of the Operating Engineers that this factor favors an award of the disputed work to employees whom it represents.

On previous occasions the Board has refused to accord significant weight to such awards when they fail to explicate the factors upon which they are based. In the instant case the awards consist of brief letters which rely on either the 1954 agreement between the two Internationals, discussed supra, or a 1907 decision apparently made by the American Federation of Labor. The letters do not set forth any other factors as a basis for the award. As indicated above, we do not attach any weight to the 1954 memorandum of understanding, and the record sheds little light on the 1907 decision by the American Federation of Labor. Moreover, we note that the Employer is not obligated to submit any dispute to the Impartial Jurisdictional Disputes Board, and the decisions submitted in evidence are not binding on the Employer. We therefore accord the decision no weight in determining the award of the disputed work.

7. Employer preference

The Employer originally assigned the disputed work to employees represented by the Laborers, and it has expressed its clear preference that the disputed work be awarded to those employees. Accordingly, we find that this factor favors an award to employees represented by the Laborers.

Conclusion

Upon the record as a whole, and after full consideration of all relevant factors involved, we conclude that employees who are represented by the Laborers are entitled to perform the work in dispute. We reach this conclusion relying on the factors of the collective-bargaining agreements, employer practice, and employer preference. In making this determination, we are awarding the work in question to employees who are represented by the Laborers, but not to the Union or its members. The present determination is limited to the particular controversy which gave rise to this proceeding.

DETERMINATION OF DISPUTE

Pursuant to Section 10(k) of the National Labor Relations Act, as amended, and upon the basis of the foregoing findings and the entire record in this proceeding, the National Labor Relations Board hereby makes the following determination of dispute:

1. Employees of McWad, Inc., who are represented by Laborers International Union of North America Local 1359 are entitled to perform the work of operating forklifts and skid loaders used in connection with McWad, Inc.'s masonry work at the construction site of the Employer's Insurance of Wausau Training Center in Wausau, Wisconsin.

2. International Union of Operating Engineers, Local No. 139, is not entitled by means proscribed by Section 8(b)(4)(D) of the Act to force or require McWad, Inc., to assign the disputed work to employees represented by that labor organization.

3. Within 10 days from the date of this Decision and Determination of Dispute, International Union of Operating Engineers, Local No. 139, shall notify the Regional Director for Region 30, in writing, whether or not it will refrain from forcing or requiring the Employer, by means proscribed by Section 8(b)(4)(D) of the Act, to assign the disputed work in a manner inconsistent with the above determination.

Dated. Washington, D.C. July 27, 1982

Howard Jenkins, Jr.,
Member

Don A. Zimmerman,
Member

Robert P. Hunter.
Member

NATIONAL LABOR RELATIONS BOARD
SEAL



ANCHOR "Hy-Dump"
Low Charge 38"- High Discharge 35" 12 cu. ft. capacity
Power Dump

Dealer
Inquiries
Invited

Anchor

Designed especially to provide a low charging height and a high discharge height coupled with a power dump. A fast mixing machine capable of dumping into wheelbarrow, concrete buggy or mortar pump.

For information, phone (312) 247-2530 or write
ANCHOR MANUFACTURING CO.
2922 W. 26th St.. Chicago, III. 60623



ORIGINATORS OF
Pre-Fabricated Glass Block Panels

CUSTOM MADE TO YOUR REQUIREMENTS
NATIONAL DISTRIBUTOR
PITTSBURGH CORNING
SCHALKE GLASS BLOCK-GERRIX HOLLOW
GLASS BLOCK

MANY STYLES AND SHAPES

SASH REPLACEMENT

SPECIALISTS IN THE INSTALLATION OF
GLASS BLOCK

FRED BEYER
Since 1910
7810 S. Claremont Chicago, III. 60620
(312) PR 8-4300


MASONRY STRONG Podcast Episode 19 Recap: Mike & Tom Finch
April 2025

On this episode of the MASONRY STRONG Podcast, Mike and Tom Finch join the set in Indianapolis to crack jokes, talk about how they both got started in this industry, and the ways they've seen this trade advance and evolve over the years. The Roots of a F

Echelon Masonry Introduces Ashton Brick, Its Latest Line of Artisan Masonry Veneers
April 2025

Echelon Masonry, North America’s leader in architectural masonry products and materials, announces the availability of its newest product line of artisan masonry veneers, Ashton Brick, in select states. Combining a classic brick aesthetic with durable con

MCAA Showcases Innovation at North Florida Masonry Showcase
April 2025

On Friday, April 11th, we had the pleasure of representing the Mason Contractors Association of America and our Outreach and Education Division at the North Florida Masonry Showcase. This event welcomed 15 high school students who demonstrated their growi

Thank You For Bidding In The 2025 Online Auction
April 2025

The MCAA extends a huge thank you to everyone who bid in this year’s online auction. With hundreds of bids on over 150 items, this year’s auction was another huge success. We also want to thank all of our amazing donors who put items up for auction. Wit