Masonry Magazine September 2009 Page. 21

Words: Jennifer Morrell, Tad Lunger, Gary Fry
Masonry Magazine September 2009 Page. 21

Masonry Magazine September 2009 Page. 21

MASONRY COMPUTER ESTIMATING

Masonry Computer Estimating
That Does It All... in 3D!
by TRADESMEN'S SOFTWARE

to courtesy of Scaface
avel

Save time and money, increase production

ADJUSTABLE SCAFFOLDING can cut mason contractors labor costs, compared to other scaffold systems, while simultaneously boosting production, manufacturers say. The scaffolding is able to hold down costs and increase productivity, since it's fast and easy to set up, move and place in constricted areas.

"Adjustable scaffold saves you two to three times the scaffold labor versus frame scaffold and increases production by 30 percent or more," Bridges says.

He says his company's crank-up scaffolding is simple to assemble and, once it's together, the unit can be moved around the jobsite without having to be taken apart.

EZ Scaffold
"It does not require a lot of work (to assemble), is done mostly on the ground, and is moved partially or fully assembled," Bridges says. "We have a light-duty crank-up that is great for partition walls. It gives a contractor the advantage of a crank-up scaffold in areas where they never had it before. It also is easier to set up by hand."

Fast and easy scaffolding

Christian Fortin, CEO for Scafjack in Lavaltrie, Quebec, says his company's Scafjack system also can increase production for mason contractors. The Scafjack is a side bracket, available in mechanical or hydraulic models, that attaches to the scaffolding to raise the planks as the mason contractor completes the wall.

"The main benefit of the Scafjack is that it's a small investment to improve their production considerably," Fortin says. "The guys already have the scaffolding, so they don't have to buy new."

With the Scafjack, workers never have to leave the scaffolding or remove planks. Instead, the planks are raised in place, Fortin says. Scafjack is ideal for medium-sized masonry firms

www.masonrymagazine.com

New for 2009!

On-Screen 3D Take-Off
Just point and click on the digital blueprint and see your walls displayed. Our new On-Screen 3D Take-Off Engine makes it simple and fast.

Runs on Windows PCs and Bootcamp/Windows on Intel Macs.

30 day money back guarantee.

Support available 7 days a week.
152
Comes with more than 400 items in material database.

See the actual building being displayed in 3D as you do your take-off in either PLAN mode, PERSPECTIVE mode, OUTSIDE mode, INSIDE mode or at any ELEVATION.

Complete your take-off, then walk through or around and see the actual finished buildingis).

Calculates CMU: HALF and FULL BULLNOSE, DOUBLE BULLNOSE, CHAMFER, or SASH for any or all OPENINGS, JAMBS, CORNERS, CONTROL JOINTS and any SPECIAL CUTS

Integrate with Accounting Software and transfer data to Microsoft Excel®.

Negotiating projects with a 3D image will win you more contracts and enhance your professional image

TRADESMEN'S SOFTWARE, Inc.
1-800-494-4899
See for yourself at:
www.tradesmens.com

READER SERVICE #163
September 2009
MASONRY
19


Youth Outreach and Education Arm Attends the 2025 Florida SkillsUSA Competition
May 2025

The Mason Contractors Association of America (MCAA), in partnership with Florida Masonry Inc., proudly participated in the 2025 Florida SkillsUSA competition. This year’s masonry contest featured seven skilled student competitors and drew significant atte

Business Building: Top Field Systems To Achieve Results!
May 2025

To be successful in the construction business, you must achieve the field results you want to achieve. Therefore, what systems and standards do you have, maintain, train, and enforce which will almost certainly guarantee you will finish your jobs on time,

Marvelous Masonry: The Technical Administration Building, Frankfurt, Germany
May 2025

The Technical Administration Building in Frankfurt, Germany, is a testament to masonry construction's craftsmanship and durability. This iconic structure reflects the architectural trends of its era and serves as a case study in masonry preservation and r

Contractor Tip of the Month: Making Yourself Available for What Matters Most
May 2025

Your responsiveness is a key factor in achieving success in your career. Opportunities don’t wait, and neither do customers, employees, or critical decisions. Prioritizing accessibility, especially during pivotal moments, can be the difference between sec